Die 2-Minuten-Regel für Leipzig
Tonlos more work welches scheduled to complete the Elster-Saale canal. Such a move would allow small boats to reach the Elbe from Leipzig. The intended completion date has been postponed because of an unacceptable cost-benefit ratio.
[51] This bombing was the largest up to that time. Due to the c